About Eunsung O&C
H > COMPANY > About Eunsung O&C
Established in 1989, Eunsung O&C Co. Ltd. boasts a proud tradition of dedication for satisfying clients’ needs. For nearly four decades, we have continuously promoted high-level expertise in civil engineering ground improvement and foundation construction works on land and offshore.
We are unique in that we can undertake ground improvement and foundation construction works both on land and in a marine environment. These works include but are not limited to Deep Cement Mixing(DCM), Diaphragm / Slurry walls, Soil Cement walls(SCW), Large Diameter Bored Piles(RCD), Sand Compaction Piles(SCP) and Sand Drains(SD).
When undertaking a marine project, we have the full capability of building tailor-made construction vessels outfitted with any necessary equipment as well as making modifications to suit the special need of each project. For example, we have recently built 3 new DCM barges in record time to meet the demanding schedule of a large marine ground improvement project in Hong Kong. Our team received overwhelmingly positive feedback about the performance of the 3 DCM barges.
Over the course of conducting nearly three dozen projects both domestically and abroad, we have gained key experience in carrying out construction works internationally. We had successfully undertaken work in places such as Hong Kong, Australia, Brazil, Kuwait, Madagascar, and Taiwan.
It has always been our ethos to spearhead technological advancement through the process of research and development. We utilize a broad network of data from past projects and client feedback to systematically improve our designs iteratively. For example, this streamlined process has enabled us to incorporate new design features and solutions to our 3rd barge delivered for the Hong Kong project on feedback regarding the 1st barge.
Our innovative approach is most appropriately demonstrated by our vessel KUS-ISLAND, purposely built for laying the gravel bedding of one of the world’s longest Immersed Tube Tunnels (IMT) in Busan. The technique we developed for laying the gravel is considered the pinnacle of technology in this regard and is often the target for emulation.
We shall endeavor to continue our efforts in our projects to satisfy our clients and maintain exceptional performance as we have been throughout the life of our company. Our team at Eunsung O&C is sincerely looking forward to having the opportunity to provide you with our services.